1. Survey the space and existing services
We review the rooms, electrical supply, outdoor-unit position, refrigerant pipe route and condensate drainage. For concealed units, ceiling access, ductwork, return air and future maintenance space are part of the assessment. Apartment and community rules are checked with the owner or building manager.
2. Agree the equipment and installation scope
The written proposal separates equipment supply from installation labour and site-specific extras. It identifies the selected unit combination, pipework allowance, brackets or supports, controls and commissioning. Electrical upgrades, crane work, scaffolding, ceiling alterations and decorative making-good are identified where required.
3. Install and commission the system
Installation follows the selected equipment requirements for mounting, pipework, insulation, electrical connections and drainage. The commissioning scope includes appropriate leak checks, evacuation and charging where applicable, condensate testing, control operation and running checks. These are technician tasks, not homeowner DIY work.
We explain the controls, maintenance access and the agreed work completed. Any remaining building work or separate contractor responsibilities are identified at handover.
Split, ducted and larger systems
A wall split has different installation constraints from a ducted unit. VRF/VRV requires connected-system design and manufacturer-approved combinations. Package and rooftop units may require lifting and a review of existing duct connections.
Prepare for your installation enquiry
- Property type, location and number of rooms or units.
- Existing equipment labels, if replacing a system.
- Room photographs and proposed indoor/outdoor positions.
- Building access rules and any required approvals.
- Whether you need supply included or already own the equipment.
Need help choosing and buying the AC? We can combine supply and installation in one itemised proposal.